Client: Ard Properties
Location: Dundalk, Co. Louth
Sector: Industrial
This Dundalk Factory Phase 2 project involved the construction of a 2,400 m2 warehouse. The warehouse was a steel structure with block and kingspan cladding to the exterior walls. Also included were siteworks such as drainage, roadways and a reinforced concrete storage area.